Agent Application DevelopmentAccount
Knowledge catalogChoose core direction and segmented content
Practice 37AdvancedSystem designAbout 18 minutes

Corresponding knowledge: Fair scheduling, resource quotas, and backpressure across tenants

How can a large customer submit 10,000 Agent tasks without bringing down other tenants?

Examine multi-tenant queuing, fair scheduling, backpressure and multi-dimensional quotas.

Queuemulti-tenantback pressure

Knowledge content check2026-10-03 · Check the source of the original question2026-10-02

Knowledge unit directory

LEARN · PRACTICE · REFLECT

Knowledge exercises·Independent answers

My notes and review ↗

Principles and Solutions have been collapsed. Explain the core mechanism, boundaries and verification methods in your own words, and then compare them.

Answers and personal notes

Each modified commit will be kept as an independent history. Your level of mastery is up to you to evaluate yourself against the standards.

Explain in your own words first

The core principles, analysis, Q&A and migration cases have been closed. When you are ready, unfold it and compare it with the content to find any omissions.

Hands-on verificationComplete on demand · Suggestions15 minutes

Design scheduling and observation indicators for 1,000 long tasks for large tenants and 5 short tasks for small tenants.

Expand acceptance requirements and checkpoints
  • Small tenants don’t have to wait indefinitely
  • Downstream current restriction reversely reduces consumption
  • Both cost and concurrency have bounds

Key inspections

  • Quota override submission and execution
  • Can provide fair scheduling and back pressure
  • Observe tail latency by tenant